CADDIS Case Study – Jim Cole – Production Manager
Jim Cole is a Production Manager with LeClaire Manufacturing and has been utilizing the CADDIS device for the past two years. Jim currently has CADDIS monitoring Permanent Mold, Sinto, CNC’s and Shot Blasting machines throughout his department. CADDIS has helped Jim increase overall productivity and better manage start times, cycle times, up-time and overall machine utilization.
Leave a Reply
Want to join the discussion?Feel free to contribute!